MARITIME

Glasgow Harbour

Glasgow Harbour

Glasgow Harbour (Clydeport and BoS Venture), £16 million

Design, technical support and site supervision of the new quay works at the 1.6 mile long riverside site. The scheme included 271m of new sheet pile quays in the River Kelvin, closure of Yorkhill Basin, new and extended sheet pile quays at Yorkhill Quay and Pointhouse Infill.  

Read More
Torry Quay Reconstruction

Torry Quay Reconstruction

Aberdeen Harbour Board, £36 million

Design and project management services for the creation of four new berths for the offshore industry which would allow OSV's to optimise turnaround time and ease of access to berths with bulk commodities.

Read More
Montrose Deep Water Berth

Montrose Deep Water Berth

Montrose Harbour Authority/Farrans Construction Ltd, £8 million

Design and technical support for the design of the reconstruction of 200m of collapsed quay wall incorporating the design of a deeper berth dredged to 8.0m below Chart Datum.

Read More
Holmsgarth Mooring Dolphin 6

Holmsgarth Mooring Dolphin 6

Lerwick Port Authority, £1.7 million

Arch Henderson provided full design, tender and contract administration services for the upgrade of an existing Mooring Dolphin to a Berthing Dolphin after a major vessel impact had damaged the original structure.  

Read More
Largs Pier Reconstruction

Largs Pier Reconstruction

Caledonian Maritime Assets (also Caledonian MacBrayne), £6 million

Design, project management and site supervision for the demolition of the original pier and construction of the replacement structure. The scheme included extensive local consultation and the preparation of a physical model of the new pier.  

Read More
Portavadie Marina

Portavadie Marina

Portavadie Marina, £4.0 million

Design and technical support for the design of the new marina facilities and a new 160m long breakwater structure.  

Read More
Reconstruction of Berths 4 & 5, New Breakwater

Reconstruction of Berths 4 & 5, New Breakwater

Farrans, Warrenpoint Port Authority, £9.0 million

Arch Henderson was appointed as designer by Farran Construction Ltd for the reconstruction of two container berths at Warrenpoint Harbour. In addition, a new rubble breakwater was constructed to improve the protection of the two berths.

Read More
Lerwick North Harbour Dredging & Reclamation Works

Lerwick North Harbour Dredging & Reclamation Works

Lerwick Port Authority, £11.5 million)

Arch Henderson designed, procured and project managed £11.5 million dredging and reclamation project to remove approx. 750,000m3 of bulked dredge fill to create improved deepwater access (-9m CD) for existing general, oil logistic and future offshore decommissioning trade.  

Read More
Page 1 of 212

Connect

We have offices in:

Aberdeen, Dundee, Glasgow, Inverness, Lerwick, Falkland Islands, Southampton, Stromness and Thurso.

Website: http://www.arch-henderson.co.uk
Email: contact@arch-henderson.co.uk